Skip to content
ConstructionTools by SoftNext Solutions

Providing and fixing flooring with full depth jointing and pointing to the Vitrified/ Ce…

Indicative unit rate and the full material, labour and plant build-up — per m².

Providing and fixing flooring with full depth jointing and pointing to the Vitrified/ Ce…

per m²

Indicative unit rate

₹373.00

per m²

Materials

Resource Coeff. Unit Rate Amount
Epoxy emulsion grout (Araldite or equivalent) for joint filling 0.4 kg 480 106.72
Synthetic/resin adhesive (Fevicol SH or equivalent) for tile bedding 0.3 kg 220 36.68
Nylon tile spacers (3-5 mm, pack of 100 pcs) 0.05 pack 120 3.33

Labour

Resource Coeff. Unit Rate Amount
Mason 1st class for tile fixing and jointing 0.25 day 893 124.09
Beldar for assisting in tile laying and cleaning 0.15 day 805 67.11

Plant

No plant component for this item.

Where this comes from: reference rates from real, live projects. Indicative for early-stage estimating — verify before tender.

Need more than one rate?

Build a full BOQ with every item priced, or open this item in EstimateNext.

Looking for something else? Search all items →

About this rate

How is the rate for Providing and fixing flooring with full depth jointing and pointing to the Vitrified/ Ce… calculated?
It is built up from the material, labour and plant resources shown, with reference rates from real, live projects. Figures are indicative — verify against current market rates before tender.
What is the unit of measurement?
The rate of ₹373.00 is per m². Multiply by your quantity to estimate the line total.
Chat on WhatsApp