Tap Share in Safari, then choose Add to Home Screen.
Describe your project — get a costed BOQ
Two ways to work: generate a complete, sectioned BOQ from a plain-English brief, or price your own BOQ by uploading it. Rates referenced from real, live projects.
Plain English — type built-up area, floors, structure and finish level. We build a complete costed BOQ from it (~1 min).
What we assumed from the brief (edit your brief to change)
- Area given as ~1500 sqft per floor; total built-up area = 1500 x 3 = 4500 sqft
- Brick masonry assumed as 230mm thick burnt clay brick walls for external and 115mm for internal partitions
- Vitrified tile flooring assumed 600x600mm for all floors
- Standard finishes assumed: internal cement plastering with putty and emulsion paint, external cement plastering with wea
- RCC foundation assumed as isolated footings suitable for normal soil bearing capacity (~15 T/sqm)
- Plumbing includes cold water supply, drainage, and sanitary fittings for assumed 3 bathrooms and 1 kitchen per floor
- Electrical includes concealed copper wiring, modular switches, standard lighting points, and power points as per IS stan
- Roof assumed as RCC flat slab with waterproofing treatment on terrace
- No lift or elevator included
- No basement included
- Staircase assumed as RCC dog-legged type
- MS railing for staircase and balconies assumed
SITE PREPARATION & EARTHWORK ₹1,27,231.30
| Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|
| Site clearance including removal of grass, shrubs, rubbish and surface vegetation, and disposal within the plot area, complete as per CPWD specifications. 1.01 high | m² | 418 | 9.00 | 3,762.00 |
| Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas in foundation trenches in all kinds of soil, depth up to 1.5 m, including dressing of sides, ramming of bottoms, getting out and disposal of surplus excavated earth within 50 m lead. 1.02 high | m³ | 95 | 260.30 | 24,728.50 |
| Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering. 1.03 high | m³ | 55 | 124.50 | 6,847.50 |
| Supplying and filling in plinth with approved sand/moorum under floors in layers not exceeding 20 cm, consolidated by watering and ramming, complete. 1.04 high | m³ | 42 | 1,880.15 | 78,966.30 |
| Anti-termite treatment, pre-constructional, to foundations, column pits, plinth filling and junctions of walls and floors with approved emulsifiable concentrate chemical, complete as per IS 6313. 1.05 high | m² | 139 | 93.00 | 12,927.00 |
PLAIN & REINFORCED CEMENT CONCRETE ₹38,53,876.50
| Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|
| Providing and laying in position cement concrete of mix 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) in foundation levelling course / plain cement concrete, excluding cost of centering and shuttering. 2.01 high | m³ | 18 | 4,875.15 | 87,752.70 |
| Providing and laying reinforced cement concrete M-25 grade in foundations and footings including centering, shuttering but excluding cost of reinforcement, complete as per IS 456. 2.02 high | m³ | 38 | 6,270.00 | 2,38,260.00 |
| Providing and laying reinforced cement concrete M-25 grade in beams and lintels, including centering and shuttering, excluding cost of reinforcement, complete as per IS 456. 2.04 high | m³ | 42 | 13,728.40 | 5,76,592.80 |
| Providing and laying reinforced cement concrete M-25 grade in suspended floor slabs and roof slabs, including centering and shuttering, excluding cost of reinforcement, complete as per IS 456. 2.05 high | m³ | 78 | 11,505.50 | 8,97,429.00 |
| Providing and laying reinforced cement concrete M-25 grade in staircases including landings, waist slab and steps, with centering and shuttering, excluding reinforcement. 2.06 high | m³ | 8 | 7,605.25 | 60,842.00 |
| Thermo-mechanically treated (TMT) reinforcement bars Fe-500D, cut, bent, placed in position and bound with annealed steel wire, complete for all RCC work. 2.07 high | kg | 20,000 | 99.65 | 19,93,000.00 |
WATERPROOFING ₹1,98,559.84
| Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|
| Providing and laying integral cement-based waterproofing treatment to terrace roof with brick-bat coba, laid to slope, including base coat, over the RCC slab, complete as per CPWD specification. 6.01 high | m² | 139 | 1,241.56 | 1,72,576.84 |
| Providing and applying polymer-modified cementitious waterproofing coating in bathrooms, balconies and sunken slabs, two coats, complete. 6.02 high | m² | 60 | 433.05 | 25,983.00 |
BRICK MASONRY & BLOCKWORK ₹10,92,690.50
| Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|
| Brick masonry work with first class/modular bricks in cement mortar 1:6 (1 cement : 6 coarse sand) in superstructure for 230 mm thick external walls, including racking of joints, complete. 3.01 high | m³ | 95 | 7,869.50 | 7,47,602.50 |
| Brick masonry work with first class/modular bricks in cement mortar 1:4 (1 cement : 4 coarse sand) in 115 mm thick internal partition walls, including providing and placing reinforcement at every third course, complete. 3.02 high | m² | 320 | 1,078.40 | 3,45,088.00 |
DOORS, WINDOWS & JOINERY ₹4,04,854.75
| Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|
| Providing and fixing factory-made flush door shutters 35 mm thick with commercial ply face, hung on seasoned hardwood frame, including hinges, hold-fast, tower bolts and fittings, complete for internal doors. 5.01 high | m² | 42 | 2,775.00 | 1,16,550.00 |
| Providing and fixing aluminium/UPVC glazed windows with factory-made sections, glazing with 5 mm float glass, including locking arrangement and fittings, complete. 5.02 high | m² | 55 | 5,028.85 | 2,76,586.75 |
| Providing and fixing main entrance door of seasoned teak wood frame with panelled/flush shutter and hardware fittings, complete. 5.03 high | m² | 6 | 1,953.00 | 11,718.00 |
INTERNAL & EXTERNAL FINISHES ₹13,75,828.30
| Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|
| 12 mm cement plaster of mix 1:6 (1 cement : 6 fine sand) on internal wall surfaces, finished even and smooth, complete. 4.01 high | m² | 1,250 | 248.97 | 3,11,212.50 |
| 20 mm cement plaster in two coats under layer 12 mm thick 1:5 and top layer 8 mm 1:6 on external wall surfaces, finished rough for receiving paint, complete. 4.02 high | m² | 560 | 274.20 | 1,53,552.00 |
| Wall painting with premium acrylic emulsion paint of approved brand and manufacture on internal walls, two coats over one coat of primer, complete. 4.03 high | m² | 1,250 | 74.80 | 93,500.00 |
| Applying exterior weatherproof acrylic emulsion/textured paint of approved brand on external walls, two coats over primer, complete. 4.04 high | m² | 560 | 99.98 | 55,988.80 |
| Providing and laying vitrified floor tiles of approved make and size (600x600 mm) with water absorption less than 0.08%, laid over 20 mm thick cement mortar bed 1:4, jointed with grout, complete. 4.05 high | m² | 390 | 1,559.10 | 6,08,049.00 |
| Providing and laying anti-skid ceramic floor tiles in bathrooms, kitchen and balconies laid over 20 mm cement mortar bed 1:4, jointed with grout, complete. 4.06 high | m² | 60 | 856.85 | 51,411.00 |
| Providing and fixing glazed/ceramic wall tiles (300x450 mm) in dado up to ceiling in bathrooms and up to 600 mm above counter in kitchen, over 12 mm cement plaster 1:3, jointed with grout, complete. 4.07 high | m² | 130 | 785.50 | 1,02,115.00 |
Drop your BOQ here to price it
Already have a BOQ? Upload an .xlsx / .xls / .csv (up to 2 MB) — we match each line to a rate. First 25 rows priced free.
Needs a header row with three columns: Description, Unit, Qty. Extra columns (code, rate, amount) are ignored.
Watch · 2:42 · no sound, captions on
See how EstimateNext prices a BOQ
A screen recording of EstimateNext, the estimating platform behind the pricing in this free tool: from an uploaded BOQ to an offer ready to send.
Chapters
Installs the full EstimateNext platform. The “Install app” button at the top of this page installs only this free BOQ tool.
About the BOQ
- How do I generate a BOQ?
- Describe your project in plain English — built-up area, floors, structure, finish level. We build a complete, sectioned, costed BOQ from it in about a minute, with a representative quantity, rate and amount on every line.
- Can I price my own BOQ?
- Yes. Switch to "Price my BOQ", upload an Excel/CSV of your descriptions, units and quantities, and the engine matches each line to a rate and returns a priced version with a confidence badge per row.
- How accurate are the BOQ numbers?
- Rates are indicative, referenced from real, live projects. Use them for early-stage budgeting and verify against current market rates before tender.