Skip to content
ConstructionTools by SoftNext Solutions

Describe your project — get a costed BOQ

Two ways to work: generate a complete, sectioned BOQ from a plain-English brief, or price your own BOQ by uploading it. Rates referenced from real, live projects.

Rate Analysis →

Plain English — type built-up area, floors, structure and finish level. We build a complete costed BOQ from it (~1 min).

Try:
10 free generations/day · structured BOQ with quantities & pricing
Sample BOQ — generated from a typical India brief Source: reference rates from real, live projects · 46 lines
What we assumed from the brief (edit your brief to change)
  • 1500 sqft per floor × 3 floors = 4500 sqft total built-up area
  • Brick masonry assumed as 230mm thick burnt clay brick walls for external and 115mm for internal partitions
  • Vitrified tile flooring assumed 600×600mm tiles in all rooms
  • Standard finishes assumed as internal cement plastering with putty and emulsion paint
  • External finish assumed as sand-faced cement plastering with exterior emulsion paint
  • Basic electrical assumed as concealed copper wiring with standard switches, one DB per floor, adequate light and power p
  • Basic plumbing assumed as CPVC for hot water, uPVC for cold water supply, and PVC for drainage
  • Foundation assumed as isolated RCC footings on medium soil with safe bearing capacity of 150 kN/sqm
  • Roof assumed as RCC flat slab with waterproofing treatment on terrace
  • Staircase assumed as RCC dog-legged type
  • Bathroom and kitchen wall tiles assumed up to 7 ft height with ceramic tiles
  • Windows assumed as aluminium sliding type with 5mm clear glass
Substructure ₹13,24,471.10
Substructure line items
Description Unit Qty Rate Amount
Anti-termite treatment to soil under foundation, plinth, and floors using approved chemicals as per IS 6313 (Part II)
2.01 high
418 101.50 42,427.00
Earthwork excavation in foundation trenches for RCC framed structure including disposal of surplus soil within site
2.02 high
210 366.86 77,040.60
Filling in plinth with selected earth, watering, compaction, and dressing up to required levels
2.03 high
60 248.00 14,880.00
Providing and laying Plain Cement Concrete (PCC) 1:4:8 in foundations and under floors as per IS 456
2.04 high
42 4,786.10 2,01,016.20
RCC M20 grade for footings, plinth beams, and columns up to plinth level including shuttering and finishing
2.05 high
55 6,366.00 3,50,130.00
Supplying and fixing TMT Fe500D reinforcement for substructure including cutting, bending, binding, and placing in position
2.06 high
kg 8,250 75.45 6,22,462.50
Brick masonry in cement mortar 1:6 for foundation and plinth walls using class 1 bricks
2.07 high
38 434.60 16,514.80
Superstructure ₹27,30,441.13
Superstructure line items
Description Unit Qty Rate Amount
RCC M25 grade for columns, beams, slabs, and staircases above plinth level including shuttering and finishing
3.01 high
175 2,472.11 4,32,619.25
Supplying and fixing TMT Fe500D reinforcement for superstructure including cutting, bending, binding, and placing in position
3.02 high
kg 26,250 75.45 19,80,562.50
Brick masonry in cement mortar 1:6 for walls above plinth level using class 1 bricks
3.03 high
120 428.80 51,456.00
Brick masonry in cement mortar 1:4 for partition walls in kitchens, bathrooms, and bedrooms
3.04 high
38 1.15 43.70
Providing and fixing precast RCC lintels and sills over doors, windows, and ventilators
3.05 high
6 7,951.88 47,711.28
Providing and fixing RCC staircase including finishing, nosing, and handrail base
3.06 high
12 13,266.80 1,59,201.60
Providing and fixing RCC parapet walls and balcony projections as per architectural drawings
3.07 high
8 7,355.85 58,846.80
Waterproofing & Damp Proofing ₹2,07,994.50
Waterproofing & Damp Proofing line items
Description Unit Qty Rate Amount
Waterproofing treatment to terrace slab with two coats of polymer modified cement slurry and protective screed
4.01 high
150 996.00 1,49,400.00
Waterproofing treatment to balconies and bathrooms with chemical coating and screed as per reference rates specifications
4.02 high
90 519.00 46,710.00
Damp proof course (DPC) 40 mm thick with cement mortar 1:2 and waterproofing compound at plinth level
4.03 high
45 264.10 11,884.50
Doors, Windows & Joinery ₹10,02,457.50
Doors, Windows & Joinery line items
Description Unit Qty Rate Amount
Providing and fixing flush doors with hardwood frame and ISI marked fittings including painting/polishing
6.01 high
110 2,819.25 3,10,117.50
Providing and fixing UPVC windows with double glazing and ISI marked hardware
6.02 high
95 5,060.00 4,80,700.00
Providing and fixing ventilators with aluminum frame and glass panels including mosquito mesh
6.03 high
18 5,102.50 91,845.00
Providing and fixing stainless steel railing for staircase and balconies including supports and brackets
6.04 high
rm 65 1,843.00 1,19,795.00
Finishes ₹24,69,620.00
Finishes line items
Description Unit Qty Rate Amount
Internal plastering with cement mortar 1:6, 15 mm thick to walls, columns, and ceilings
5.01 high
2,100 156.00 3,27,600.00
External plastering with cement mortar 1:4, 18 mm thick to external walls, parapets, and projections
5.02 high
650 148.00 96,200.00
Providing and fixing vitrified tiles of approved shade and size in living, dining, bedrooms, and corridors including skirting
5.03 high
1,200 1,559.10 18,70,920.00
Ceramic tiles in kitchens and bathrooms for flooring and dado up to 2.1 m height
5.04 high
220 795.00 1,74,900.00
Granite stone for kitchen platform including edge polishing and fixing with cement mortar
5.05
18
Providing and fixing marble/stone sills for windows and ventilators
5.06
32
Painting internal walls and ceilings with acrylic emulsion paint of approved shade in two coats over primer
5.07
2,100
Painting external walls with weatherproof acrylic paint in two coats over primer
5.08
650
Polishing woodwork including doors, windows, and handrails with approved polish
5.09
120
Plumbing & Sanitary ₹0.00
Plumbing & Sanitary line items
Description Unit Qty Rate Amount
Providing and fixing CPVC pipes for internal water supply including fittings, clamps, and testing
9.01
rm 420
Providing and fixing sanitary fixtures (EWC, wash basin, urinals, kitchen sinks) of approved make including all accessories
9.03
nos 24
Providing and fixing chromium plated brass fittings (taps, mixers, showers) in bathrooms and kitchens
9.04
nos 36
Waterproofing and tiling in bathrooms and kitchen areas up to 2.1 m height
9.05
110
Providing and fixing underground PVC pipes for external drainage including manholes, chambers, and gully traps
9.06
rm 110
Electrical & ELV ₹0.00
Electrical & ELV line items
Description Unit Qty Rate Amount
Supply and installation of distribution boards, MCBs, RCCBs, and DBs as per IS 732
10.02
nos 12
Supply and installation of LED light fixtures, ceiling fans, exhaust fans, and accessories
10.03
nos 110
Earthing with copper plate and GI strip including excavation, backfilling, and testing
10.04
nos 6
Supply and installation of main LT panel including MCCB, busbar, and metering as per reference rates standards
10.05
nos 1
Lifts & Vertical Transportation ₹0.00
Lifts & Vertical Transportation line items
Description Unit Qty Rate Amount
Supply, installation, testing, and commissioning of passenger lift (6 persons, automatic, 3 stops) including shaft and pit finishing
8.01
nos 1
Supply, installation, testing, and commissioning of service lift (goods, 3 stops) including shaft and pit finishing
8.02
nos 1
External Development ₹0.00
External Development line items
Description Unit Qty Rate Amount
Construction of internal roads and pathways with RCC/bituminous surface including base preparation
12.01
210
Boundary wall construction with brick masonry, plaster, and painting including gates and security cabin
12.03
rm 110
Storm water drainage system including RCC pipes, chambers, and gratings
12.04
rm 85
Common Areas & Amenities ₹0.00
Common Areas & Amenities line items
Description Unit Qty Rate Amount
Vitrified tile flooring and skirting in lobby, corridors, and common areas including base preparation
7.01
180
Provision for gym flooring with rubber tiles and wall mirrors as per approved design
7.02
35

About the BOQ

How do I generate a BOQ?
Describe your project in plain English — built-up area, floors, structure, finish level. We build a complete, sectioned, costed BOQ from it in about a minute, with a representative quantity, rate and amount on every line.
Can I price my own BOQ?
Yes. Switch to "Price my BOQ", upload an Excel/CSV of your descriptions, units and quantities, and the engine matches each line to a rate and returns a priced version with a confidence badge per row.
How accurate are the BOQ numbers?
Rates are indicative, referenced from real, live projects. Use them for early-stage budgeting and verify against current market rates before tender.
Chat on WhatsApp