Skip to content
ConstructionTools by SoftNext Solutions

Boundary wall & gate BOQ Template — United Kingdom

Compound walls, fencing and gates — footing to coping, priced per running length.

Generate this BOQ → Pre-filled with an example brief · edit before you generate · 10 free/day

What's in a boundary wall & gate BOQ

Plot compound walls, site hoarding, fencing and entrance gates.

  1. 1
    Excavation & footing
    Trench excavation, PCC bed and foundation concrete.
  2. 2
    Foundation masonry / RCC
    Below-ground masonry or RCC up to plinth level.
  3. 3
    Wall masonry & columns
    Brick/block wall panels with intermediate RCC columns.
  4. 4
    RCC coping & capping
    Coping beam, capping and any precast elements.
  5. 5
    Plaster & finishes
    Both-side plaster, texture and external paint.
  6. 6
    Gate & ironmongery
    MS/automated gate, posts, hinges, locks and grills.
  7. 7
    Fencing (optional)
    Chain-link, barbed wire or palisade above the wall.

Example brief for this template

This is the brief we'll pre-fill in the BOQ generator. Edit it to match your project.

Boundary wall, ~200 running metres, 1.8 m high, blockwork with RCC columns at 3 m centres and a coping beam, both-side render and paint, plus a 4 m steel gate.

✨ Generate this BOQ Builds a complete, sectioned BOQ with quantities & pricing (~1 min).

Boundary wall & gate BOQ — FAQ

What sections are in a boundary wall & gate BOQ?
A typical boundary wall & gate BOQ is organised into 7 sections: Excavation & footing, Foundation masonry / RCC, Wall masonry & columns, RCC coping & capping, Plaster & finishes, Gate & ironmongery, Fencing (optional). Exact sections vary with scope, structure and site conditions.
How do I create a boundary wall & gate BOQ?
Describe the project in plain English — size, floors, structure and finish level — and the generator builds a complete, sectioned BOQ with a quantity, rate and amount on every line in about a minute. This page pre-fills a sensible example brief for you to edit.
Are the rates accurate?
Rates are indicative, referenced from real, live projects. Use them for early-stage budgeting and verify against current market rates before tender.
Can I price my own BOQ?
Yes — switch to "Price my BOQ" in the generator and upload an Excel or CSV of your descriptions, units and quantities. Each line is matched to a rate with a confidence badge.

Other project types

Chat on WhatsApp