Skip to content
ConstructionTools by SoftNext Solutions

Describe your project — get a costed estimate

Two ways to work: generate a complete, sectioned Cost Estimate from a plain-English brief, or price your own Cost Estimate by uploading it. Rates referenced from real, live projects.

Rate Analysis →

Plain English — type size, storeys, structure and finish level. We build a complete costed Cost Estimate from it (~1 min).

Try:
10 free generations/day · structured Cost Estimate with quantities & pricing
Sample Cost Estimate — generated from a typical USA brief Source: reference rates from real, live projects · 21 lines
What we assumed from the brief (edit your brief to change)
  • Area given as ~1500 sqft per floor; total built-up area calculated as 1500 x 2 = 3000 sqft
  • Concrete foundation assumed to be conventional spread/strip footing with slab-on-grade
  • Standard finishes interpreted as builder-grade drywall, paint, carpet/LVP flooring, and ceramic tile in wet areas
  • Plumbing includes typical residential fixtures: 2.5 baths, kitchen, and laundry connections
  • Electrical includes 200A service panel, standard outlet/switch layout, and lighting fixtures
  • HVAC system assumed as forced-air central heat and cooling (not explicitly stated)
  • Roofing assumed as asphalt shingle on plywood sheathing with standard underlayment
  • Windows and exterior doors assumed as standard vinyl double-pane
  • Exterior cladding assumed as vinyl or fiber-cement lap siding
  • Insulation assumed per current IRC code minimums for climate zone 4 (mid-US default)
  • No garage, deck, or porch included unless specified
  • No basement assumed; slab-on-grade ground floor
DIVISION 03 - CONCRETE $11,998.00
DIVISION 03 - CONCRETE line items
Description Unit Qty Rate Amount
Reinforced concrete strip footings, 3000 PSI mix, including formwork, rebar, and placement
3.01 AI estimate
CY 22 304.00 6,688.00
4 in concrete slab-on-grade, 3000 PSI mix, over vapor barrier and compacted fill, with WWF reinforcement and troweled finish
3.03 AI estimate
SF 1,500 3.54 5,310.00
DIVISION 09 - FINISHES $85,740.00
DIVISION 09 - FINISHES line items
Description Unit Qty Rate Amount
1/2 in gypsum board to walls and ceilings, taped, finished level 4, including corner bead
9.01 AI estimate
SF 9,000 3.57 32,130.00
Interior painting, primer plus two coats to walls, ceilings, and trim, standard finish
9.02 AI estimate
SF 9,000 0.98 8,820.00
Floor finishes: carpet/LVP/tile mix, standard grade, including underlayment and transitions
9.03 AI estimate
SF 3,000 6.39 19,170.00
Interior trim, baseboard, casing, and millwork, standard grade
9.04 AI estimate
LF 1,200 21.35 25,620.00
DIVISION 22 - PLUMBING $4,055.00
DIVISION 22 - PLUMBING line items
Description Unit Qty Rate Amount
Water heater, 50-gallon, including connections and relief piping
22.03 AI estimate
EA 1 4,055.00 4,055.00
DIVISION 26 - ELECTRICAL $1,114.40
DIVISION 26 - ELECTRICAL line items
Description Unit Qty Rate Amount
Smoke/carbon monoxide detectors, hardwired and interconnected per code
26.03 AI estimate
EA 8 139.30 1,114.40
DIVISION 06 - WOOD, PLASTICS & COMPOSITES $43,456.60
DIVISION 06 - WOOD, PLASTICS & COMPOSITES line items
Description Unit Qty Rate Amount
Dimensional lumber wood-frame structure: exterior and interior load-bearing walls, 2x6/2x4 studs at 16 in O.C., including sill plates, headers, and blocking
6.01 AI estimate
SF 3,000 8.14 24,420.00
Engineered floor system: I-joists/floor trusses with 3/4 in T&G plywood subfloor, glued and nailed (second floor level)
6.02 AI estimate
SF 1,500 5.89 8,835.00
Roof framing: prefabricated wood roof trusses at 24 in O.C. with 1/2 in sheathing, including bracing and connectors
6.03 AI estimate
SF 1,800 3.52 6,336.00
Exterior wall sheathing, 7/16 in OSB with weather-resistive barrier
6.04 AI estimate
SF 2,560 1.51 3,865.60
DIVISION 07 - THERMAL & MOISTURE PROTECTION $42,922.00
DIVISION 07 - THERMAL & MOISTURE PROTECTION line items
Description Unit Qty Rate Amount
Asphalt shingle roofing, architectural grade, over synthetic underlayment, including ridge, valley, and drip edge
7.01 AI estimate
SF 1,800 2.83 5,094.00
Batt/blown insulation to walls (R-21) and attic (R-49), including air sealing
7.02 AI estimate
SF 3,000 1.98 5,940.00
Exterior siding/trim, standard grade, including fascia, soffit, and flashing
7.03 AI estimate
SF 2,560 11.25 28,800.00
Gutters, downspouts, and rainwater collection discharge piping
7.04 AI estimate
LF 160 19.30 3,088.00
DIVISION 08 - OPENINGS $19,180.50
DIVISION 08 - OPENINGS line items
Description Unit Qty Rate Amount
Exterior insulated entry doors, standard grade, including hardware and weatherstripping
8.01 AI estimate
EA 3 531.50 1,594.50
Interior hollow-core/panel doors with hardware, prehung
8.02 AI estimate
EA 14 859.50 12,033.00
Vinyl double-glazed Low-E insulated windows, standard grade, including flashing and trim
8.03 AI estimate
EA 20 277.65 5,553.00
DIVISION 10-12 - SPECIALTIES, CABINETRY & APPLIANCES $944.55
DIVISION 10-12 - SPECIALTIES, CABINETRY & APPLIANCES line items
Description Unit Qty Rate Amount
Bathroom vanities, countertops, mirrors, and accessories, standard grade
10.02 AI estimate
EA 3 314.85 944.55
DIVISION 23 - HVAC (SCOPE NOT TICKED) $2,610.00
DIVISION 23 - HVAC (SCOPE NOT TICKED) line items
Description Unit Qty Rate Amount
Forced-air HVAC system: furnace/condenser, ductwork, and registers for 2-story residence (gap line — HVAC scope not confirmed by estimator)
23.01 AI estimate
LS 1 2,610.00 2,610.00

Watch · 2:42 · no sound, captions on

See how EstimateNext prices a cost estimate

A screen recording of EstimateNext, the estimating platform behind the pricing in this free tool: from an uploaded cost estimate to an offer ready to send.

See how EstimateNext prices a cost estimate. This film shows EstimateNext, not the free cost estimate tool above.

Chapters

Installs the full EstimateNext platform. The “Install app” button at the top of this page installs only this free cost estimate tool.

About the cost estimate

How do I generate a cost estimate?
Describe your project in plain English — built-up area, floors, structure, finish level. We build a complete, sectioned, costed Cost Estimate from it in about a minute, with a representative quantity, rate and amount on every line.
Can I price my own Cost Estimate?
Yes. Switch to "Price my Cost Estimate", upload an Excel/CSV of your descriptions, units and quantities, and the engine matches each line to a rate and returns a priced version with a confidence badge per row.
How accurate are the cost estimate numbers?
Rates are indicative, referenced from real, live projects. Use them for early-stage budgeting and verify against current market rates before tender.

EstimateNext · the platform behind these tools

See EstimateNext price a BOQ like yours

From an uploaded BOQ to rates you can defend and an offer ready to send. Book a demo and we'll walk you through it.

Book a demo →
Chat on WhatsApp