Describe your project — get a costed estimate
Two ways to work: generate a complete, sectioned Cost Estimate from a plain-English brief, or price your own Cost Estimate by uploading it. Rates referenced from real, live projects.
Plain English — type size, storeys, structure and finish level. We build a complete costed Cost Estimate from it (~1 min).
What we assumed from the brief (edit your brief to change)
- Area given as ~1500 sqft per floor; total built-up area calculated as 1500 x 2 = 3000 sqft
- Concrete foundation assumed to be conventional spread/strip footing with slab-on-grade
- Standard finishes interpreted as builder-grade drywall, paint, carpet/LVP flooring, and ceramic tile in wet areas
- Plumbing includes typical residential fixtures: 2.5 baths, kitchen, and laundry connections
- Electrical includes 200A service panel, standard outlet/switch layout, and lighting fixtures
- HVAC system assumed as forced-air central heat and cooling (not explicitly stated)
- Roofing assumed as asphalt shingle on plywood sheathing with standard underlayment
- Windows and exterior doors assumed as standard vinyl double-pane
- Exterior cladding assumed as vinyl or fiber-cement lap siding
- Insulation assumed per current IRC code minimums for climate zone 4 (mid-US default)
- No garage, deck, or porch included unless specified
- No basement assumed; slab-on-grade ground floor
DIVISION 03 - CONCRETE $11,998.00
| Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|
| Reinforced concrete strip footings, 3000 PSI mix, including formwork, rebar, and placement 3.01 AI estimate | CY | 22 | 304.00 | 6,688.00 |
| 4 in concrete slab-on-grade, 3000 PSI mix, over vapor barrier and compacted fill, with WWF reinforcement and troweled finish 3.03 AI estimate | SF | 1,500 | 3.54 | 5,310.00 |
DIVISION 09 - FINISHES $85,740.00
| Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|
| 1/2 in gypsum board to walls and ceilings, taped, finished level 4, including corner bead 9.01 AI estimate | SF | 9,000 | 3.57 | 32,130.00 |
| Interior painting, primer plus two coats to walls, ceilings, and trim, standard finish 9.02 AI estimate | SF | 9,000 | 0.98 | 8,820.00 |
| Floor finishes: carpet/LVP/tile mix, standard grade, including underlayment and transitions 9.03 AI estimate | SF | 3,000 | 6.39 | 19,170.00 |
| Interior trim, baseboard, casing, and millwork, standard grade 9.04 AI estimate | LF | 1,200 | 21.35 | 25,620.00 |
DIVISION 22 - PLUMBING $4,055.00
| Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|
| Water heater, 50-gallon, including connections and relief piping 22.03 AI estimate | EA | 1 | 4,055.00 | 4,055.00 |
DIVISION 26 - ELECTRICAL $1,114.40
| Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|
| Smoke/carbon monoxide detectors, hardwired and interconnected per code 26.03 AI estimate | EA | 8 | 139.30 | 1,114.40 |
DIVISION 06 - WOOD, PLASTICS & COMPOSITES $43,456.60
| Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|
| Dimensional lumber wood-frame structure: exterior and interior load-bearing walls, 2x6/2x4 studs at 16 in O.C., including sill plates, headers, and blocking 6.01 AI estimate | SF | 3,000 | 8.14 | 24,420.00 |
| Engineered floor system: I-joists/floor trusses with 3/4 in T&G plywood subfloor, glued and nailed (second floor level) 6.02 AI estimate | SF | 1,500 | 5.89 | 8,835.00 |
| Roof framing: prefabricated wood roof trusses at 24 in O.C. with 1/2 in sheathing, including bracing and connectors 6.03 AI estimate | SF | 1,800 | 3.52 | 6,336.00 |
| Exterior wall sheathing, 7/16 in OSB with weather-resistive barrier 6.04 AI estimate | SF | 2,560 | 1.51 | 3,865.60 |
DIVISION 07 - THERMAL & MOISTURE PROTECTION $42,922.00
| Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|
| Asphalt shingle roofing, architectural grade, over synthetic underlayment, including ridge, valley, and drip edge 7.01 AI estimate | SF | 1,800 | 2.83 | 5,094.00 |
| Batt/blown insulation to walls (R-21) and attic (R-49), including air sealing 7.02 AI estimate | SF | 3,000 | 1.98 | 5,940.00 |
| Exterior siding/trim, standard grade, including fascia, soffit, and flashing 7.03 AI estimate | SF | 2,560 | 11.25 | 28,800.00 |
| Gutters, downspouts, and rainwater collection discharge piping 7.04 AI estimate | LF | 160 | 19.30 | 3,088.00 |
DIVISION 08 - OPENINGS $19,180.50
| Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|
| Exterior insulated entry doors, standard grade, including hardware and weatherstripping 8.01 AI estimate | EA | 3 | 531.50 | 1,594.50 |
| Interior hollow-core/panel doors with hardware, prehung 8.02 AI estimate | EA | 14 | 859.50 | 12,033.00 |
| Vinyl double-glazed Low-E insulated windows, standard grade, including flashing and trim 8.03 AI estimate | EA | 20 | 277.65 | 5,553.00 |
DIVISION 10-12 - SPECIALTIES, CABINETRY & APPLIANCES $944.55
| Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|
| Bathroom vanities, countertops, mirrors, and accessories, standard grade 10.02 AI estimate | EA | 3 | 314.85 | 944.55 |
DIVISION 23 - HVAC (SCOPE NOT TICKED) $2,610.00
| Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|
| Forced-air HVAC system: furnace/condenser, ductwork, and registers for 2-story residence (gap line — HVAC scope not confirmed by estimator) 23.01 AI estimate | LS | 1 | 2,610.00 | 2,610.00 |
Drop your Cost Estimate here to price it
Already have a Cost Estimate? Upload an .xlsx / .xls / .csv (up to 2 MB) — we match each line to a rate. First 25 rows priced free.
Needs a header row with three columns: Description, Unit, Qty. Extra columns (code, rate, amount) are ignored.
Watch · 2:42 · no sound, captions on
See how EstimateNext prices a cost estimate
A screen recording of EstimateNext, the estimating platform behind the pricing in this free tool: from an uploaded cost estimate to an offer ready to send.
Chapters
Installs the full EstimateNext platform. The “Install app” button at the top of this page installs only this free cost estimate tool.
About the cost estimate
- How do I generate a cost estimate?
- Describe your project in plain English — built-up area, floors, structure, finish level. We build a complete, sectioned, costed Cost Estimate from it in about a minute, with a representative quantity, rate and amount on every line.
- Can I price my own Cost Estimate?
- Yes. Switch to "Price my Cost Estimate", upload an Excel/CSV of your descriptions, units and quantities, and the engine matches each line to a rate and returns a priced version with a confidence badge per row.
- How accurate are the cost estimate numbers?
- Rates are indicative, referenced from real, live projects. Use them for early-stage budgeting and verify against current market rates before tender.